Walk in already ready.
Prep My Audit finds the gaps an inspector will, before they do. Readiness stops being a week-long scramble; it becomes a status you can check in seconds.
Green, amber, or red on every requirement.
Score your quality system against the criteria an auditor checks, see exactly where the evidence is thin, and close the gap before the date on the calendar arrives.
Evidence is in place and current. Nothing to do here.
A signature is missing or a record is about to lapse. One owner, one action.
The requirement has no evidence yet, flagged now rather than on audit day.
Readiness, made visible.
-
Find the gap first
Sweep the whole quality system against what inspectors look for, and surface the holes while you still have time to fill them.
-
Criteria, pre-mapped
Start from the requirements for Part 11, ISO 17025 and ISO 13485, already mapped, so you are not rebuilding the checklist from memory.
-
Readiness at a glance
One board, every requirement, colored by where you stand. The room knows in five seconds what used to take a week to assemble.
-
Every gap has an owner
Each red turns into a task with a name and a date on it, so readiness moves instead of living in a spreadsheet.
-
The evidence, assembled
Hand the auditor one organized set of exactly what they asked for. Builds on the inspection-readiness bundle Fluid ships today.
-
Re-scan to prove it
Run it again and watch red turn green. The trend itself becomes evidence the system got stronger.
See where you stand today.
Prep My Audit ships with Fluid QMS: run your first readiness scan the day you log in, and walk into the next audit already knowing the answer.